13-5/8” 10M Cameron Type U Complete BOP Stack with Shaffer Annular – Rebuilt
Complete 13-5/8” 10M Cameron Type U BOP Stack ready to ship ASAP from Houston, TX. See below for details and pictures:
1ea 13-5/8” 10M Cameron Type U Double Ram BOP, Flange Top x Flange Bottom w/ (4) 4-1/16” 10M Flange Side Outlets, Equipped with Standard Bonnet Assemblies and Manual Locking Screws, Stainless Steel Lined Ring Grooves, H2S Trim
Remanufactured by API 16A Licensed Facility per OEM dimensions
Furnished c/w New Aftermarket Seal Kit installed
Furnished Less Ram Assemblies or with if needed
Furnished c/w Data Book as per below
*Can add shear bonnets if needed for an extra cost
1ea 13-5/8” 10M Cameron Type U Single Ram BOP, Flange Top x Flange Bottom w/ (2) 4-1/16” 10M Flange Side Outlets, Equipped with Standard Bonnet Assemblies and Manual Locking Screws, Stainless Steel Lined Ring Grooves, H2S Trim
Remanufactured by API 16A Licensed Facility per OEM dimensions
Furnished c/w New Aftermarket Seal Kit installed
Furnished Less Ram Assemblies or with if needed
Furnished c/w Data Book as per below
1ea 13-5/8” 5M Shaffer Spherical, 10M Flange Bottom (BX-159) x 5M Studded Top (BX-160), Stainless Steel Lined Ring Grooves, H2S Trim
Remanufactured by API 16A Licensed Facility per OEM dimensions
Furnished c/w New Aftermarket Nitrile Packing Element and Seal Kit installed
Furnished c/w Data Book as per below
1ea Drilling Spool, 13-5/8” 10M Flange x 13-5/8” 10M Flange w/ (2) 4-1/16” 10M Flange Side Outlets, Approx. 30” Tall, Stainless Steel Lined Ring Grooves, H2S Trim
Remanufactured by API 16A Licensed Facility per OEM dimensions
Furnished c/w Data Book
All above equipment Original OEM U.S. Manufacture. Data Book for BOPs to include: API Licensing Certification for Repair Facility, Hardness Survey complying with NACE MR-0175 specifications, Dimensional Inspection Report, Magnetic Particle Inspection Reports, Dye Penetrant Inspection of Ring Grooves, Drift Test, Certification for any Chrome/Colmonoy Plating (as applicable), Welding Procedures/Specifications, Stress Relief Certification, Certificates of Conformance for New Rubber Seals & Packing Element (as applicable), Certificate of Test and Hydrostatic (Well Bore & Shell) and Hydraulic (Open and Close) Test Charts, Operations Manual and Parts List
Ex Works Houston, TX – All Above in Stock ready to ship ASAP!